<div dir="ltr">Hi LRUG<div><br></div><div>I am working on a client project that needs some Web Ops work done. I've been asked for a best guess as to "how much Web ops time" would be needed (days, weeks, months).</div><div><br></div><div>The core application is a Rails 5 monolith with a Postgres database. This needs to be installed on Azure within a corporate network, with services such as SMTP, File Storage, Azure Key Vaults.</div><div><br></div><div>Four environments, dev, staging, pre-prod and prod. CI/CD with eg Travis, Gitlab.</div><div>Some logging / health checks / error reporting</div><div>DNS configuration</div><div><br></div><div>That's about it. Pretty standard stuff. (apart from the inevitable corporate spanners in the works)<br></div><div><br class="inbox-inbox-Apple-interchange-newline">Anyone have a sense of how much time I should ask for?<br></div><div><br></div><div>Cheers</div><div>Toby</div><div><br></div><div><br></div></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div>Kind regards,</div><div><br></div>Toby Privett<div>--------------</div><div><div><a href="http://snaplab.co.uk">http://snaplab.co.uk</a></div></div></div></div>